Copyright ©  Zhenjiang Anhua Electric Co., Ltd ALL RIGHTS RESERVED      

 

苏ICP备16041567号-1 Powered by:www.300.cn

News Center

2017 pre-embedded channel performance

Classification:
Group internal news
2018/02/28 16:13
[Abstract]:
2017年,预埋槽道系列产品进一步完善,专业化工艺制造水平大幅提升,形成了产业化生产能力,取得了辉煌业绩。各类预埋槽道供货至上海地铁十五、十八号线,芜湖地铁一号、二号线,深圳地铁九号线,太原地铁二号线等大中城市,年销售金额达到8000多万元,产品质量和服务质量都得到了用户的好评。2017年底入围绍兴地铁,2018年1月入围北京地铁。

In 2017, the series of pre-buried channel products were further improved, and the level of specialized process manufacturing was greatly improved, forming an industrialized production capacity and achieving brilliant results. All kinds of pre-buried channels are supplied to Shanghai Metro Lines 15 and 18, Wuhu Metro Line 1, Line 2, Shenzhen Metro Line 9, Taiyuan Metro Line 2 and other large and medium-sized cities, with annual sales of more than 8,000. Ten thousand yuan, product quality and service quality have been well received by users. At the end of 2017, he was selected as a Shaoxing subway. In January 2018, he was shortlisted for the Beijing Subway.